Evaluate Performance, Exceptions, and Verified Outcomes
A pilot or controlled evaluation should compare the candidate workflow with a credible baseline. The evaluation plan should define the operational objective, operating period, data sources, constraints, approval mode, and success criteria before results are reviewed.
Depending on the selected workflow, useful measures may include:
Vessel turnaround or berth-window performance, with the calculation method and time boundaries defined.
Quay crane utilization, productive operating time, idle time, and workload balance.
Terminal tractor task cycle time, empty travel, queue time, and dispatch response.
Yard rehandles, block occupancy, travel distance, and container retrieval delays.
Schedule adherence, task completion time, and the number or duration of operational exceptions.
Constraint violations, rejected commands, authorization failures, manual interventions, and recovery time.
Verified action rate, calculated as actions confirmed by observed outcomes divided by eligible attempted actions, with exclusions stated.
Report adverse outcomes as well as improvements. Include cases involving inaccurate or delayed observations, equipment unavailability, communications loss, denied authorization, partial execution, and manual override. A method that improves a planning metric but increases constraint violations or recovery workload should not be presented as an unqualified improvement.
If a study uses synthetic operational data, label it as a Simulation-Based Case Study and disclose the modeled assumptions. Simulated results do not establish customer deployment, field performance, equipment compatibility, or safety certification. A site pilot must validate the data, workflow, control interface, and operational response under actual terminal conditions.