1. Prioritizing container-handling equipment inspection
A maintenance planner may need to decide which quay crane, rubber-tyred gantry crane, or terminal tractor should receive an inspection first. The decision workflow could combine recent vibration, temperature, electrical-load, and cycle-time observations with equipment operating mode, alarm history, asset criticality, and previous maintenance findings. A rules-based baseline can flag measurements that cross reviewed limits. A machine-learning method may be evaluated for patterns that are less easily represented by fixed thresholds.
The output should identify the asset, the observations that contributed to the flag, the time window, data-quality limitations, and a suggested inspection priority. It should not state a confirmed root cause unless an appropriate investigation establishes one. A maintenance supervisor or engineer reviews the recommendation and determines the next step. Evaluation can compare false alerts, missed fault episodes, detection delay, inspection findings, and maintenance-team workload against the existing process.
